Power Down Your Solar System for a Hurricane

We are advising our customers to power down their inverters in anticipation of Hurricane Florence to prevent grid instability. Instructions for SMA and SolarEdge inverters are below, and are included in your Customer Care binders.  You can also call Rob Smith at 919-459-4155 or email rsmith@yessolarsolutions.com.

SOLAREDGE

Turn rotary switch of the inverter/ DC disconnect to OFF (#3 in photo)

Switch AC disconnect to OFF (#2 in photo)

Switch breaker in main panel to OFF ( #1 in photo;only necessary for Duke Progress customers)

To power up, switch ON #1, then #2 and then #3

SMA INVERTERS

Turn rotary switch of the inverter/ DC disconnect to OFF (#3 in photo)

Switch AC disconnect to OFF (#2 in photo)

Switch breaker in main panel to OFF (#1 in photo)

To power up turn ON #1, then #2, then #3